When school resumes on January 3rd, a portion of Elk Ridge Drive will be under construction – this is shown by a dotted black line on the map. APA will still be accessible from both entrances (in front of the school, and from the staff parking lot). If you typically come from the north on Elk Ridge Drive, you will need to use an alternate route. Suggestions are shown in yellow.